Here is a photo of the finished set with the finished painted bridge in the background I worked upon
here is an example of part of my role during the show period was to trash the set mid show by throwing paper bottles and rubbish all over the set, overturning the deck chairs and the salon chairs
at the back are the side railings with their spindles needed repairs as the spindles were made of LX tape and snapped under the duress of the show period
an example of the set before the bridge was completed
after bridge completion
No comments:
Post a Comment